In the heat of the garage

810_6254s

Several months have passed and the railway is now into its full panoply of heat-induced failures – a point motor here, a section control there; all the joys of garage-based modelling and a bit of summer warmth. Consequently nothing much moves and the driver of 2357 is being a tad optimistic if he thinks the goods yard starter is going to be pulled off anytime soon.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: